Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73548 REL 92: 2010-034-00 EXP CCT OKANOGAN-VSP SST AND CHS MONITORING
Project Number:
Title:
Upper Columbia Spring Chinook and Steelhead Juvenile and Adult Abundance, Productivity and Spatial Structure Monitoring
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 5.00%
Methow 35.00%
Okanogan 25.00%
Wenatchee 35.00%
Contract Number:
73548 REL 92
Contract Title:
2010-034-00 EXP CCT OKANOGAN-VSP SST AND CHS MONITORING
Contract Continuation:
Previous: Next:
73548 REL 63: 2010-034-00 EXP CCT OKANOGAN-VSP SST & CHS MONITORING
Contract Status:
Closed
Contract Description:
About this contract:

Through BPA project #2010-034-00, this contract provides funding to expand PIT array infrastructure into the Okanogan subbasin to complete coverage of the entire Upper Columbia ESU for summer steelhead. This PIT array system is used for a multitude of monitoring and evaluation efforts. Ongoing operations and maintenance of the arrays within the Okanogan subbasin is provided by the Colville Tribes.

Through this contract, information and equipment needed for long term monitoring of VSP parameters of the Okanogan summer steelhead population is provided, which links directly to a subset of tasks contained in the umbrella project (i.e. PIT-tag array deployment and development of precision and accuracy estimates, validation of summer steelhead redd survey methodology, and potentially a more viable way to enumerate adult steelhead returns under all environmental conditions).

This contract also supports installation of new PIT array infrastructure within the Okanogan River Basin as needed. No new installations are planned for 2020-2021.


Project background:

Project 2010-034-00 is part of a unique, well-coordinated, and standardized group of monitoring and evaluation program(s) that exist in the Upper Columbia River Basin. Monitoring and evaluation programs are funded by a combination of federal (BPA, BOR, USFWS), State, Tribal, and regional (PUDs) entities.  While all these various programs contribute data to estimate VSP parameters for spring Chinook and summer steelhead, these programs also share common deficiencies related to precision and accuracy of the abundance estimates. Existing M & E activities combined with recent advances in PIT tag technology provide an opportunity to improve the quality of the data generated to make management decisions concerning ESA listed species.

The overall objectives of the project are to:
1) evaluate precision and accuracy of the smolt monitoring methodology for both steelhead and spring Chinook,
2) estimate the proportion of hatchery steelhead in each primary population,
3) estimate the precision of redd counts for both steelhead and spring Chinook, and
4) evaluate the accuracy of the steelhead spawning ground survey design.

In the Okanogan River Basin, two types of PIT-tag arrays are used:
1) permanent arrays are used to enumerate both adult returns and juvenile out-migrants on perennial streams and the mainstem river, and
2) temporary interrogation sites are installed, operated, and removed on a seasonal basis to document distribution extents of adult steelhead, fish passage at barriers, and to enumerate adult returns to intermittent watersheds.

Prior to this project, only one intermittent PIT tag array existed in the Okanogan River basin on Omak Creek. With the funding from this project, the Colville Tribes have partnered with WDFW, CRITFC, ONA, Grant PUD, Douglas PUD and BPA to create a basin-wide network of PIT tag interrogation systems throughout the Okanogan River Basin.

WDFW is the research lead for this project and will conduct all the analysis, complete research reports, and obtain all necessary environmental compliance permits (currently under CR-339311). Andrew Murdoch is the point of contact for WDFW. Colville is the primary contractor for array installation, operation, and maintenance of sites located within the Okanogan Basin. John Arterburn is the point of contact for the Colville Tribes."
Account Type(s):
Expense
Contract Start Date:
07/01/2020
Contract End Date:
06/30/2021
Current Contract Value:
$149,986
Expenditures:
$149,986

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
John Arterburn Colville Confederated Tribes Yes Contract Manager john.arterburn@colvilletribes.com (509) 422-7424
Victoria Bohlen Bonneville Power Administration Yes COR vlbohlen@bpa.gov (503) 230-3506
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Jeremy Cram Washington Department of Fish and Wildlife (WDFW) No Interested Party jeremy.cram@dfw.wa.gov (509) 664-3148
Jeannette Finley Colville Confederated Tribes No Administrative Contact Jeannette.finley@Colvilletribes.com (509) 634-2124
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Billy Gunn Colville Confederated Tribes No Administrative Contact billy.gunn@colvilletribes.com (509) 422-7740
Randy Johnson Colville Confederated Tribes No Technical Contact Randy.Johnson.FNW@colvilletribes.com (509) 422-7454
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Brian Miller Colville Confederated Tribes No Technical Contact brian.miller@colvilletribes.com (509) 422-7739
Andrew Murdoch Washington Department of Fish and Wildlife (WDFW) No Interested Party andrew.murdoch@dfw.wa.gov (509) 664-3148x15
John Stensgar, Jr Colville Confederated Tribes No Administrative Contact lj.stensgar.fnw@colvilletribes.com (509) 634-2109
Ben Truscott Washington Department of Fish and Wildlife (WDFW) No Interested Party ben.truscott@dfw.wa.gov (509) 664-3148
Kirk Truscott Colville Confederated Tribes No Supervisor kirk.truscott@colvilletribes.com (509) 978-8031
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance documents are completed cooperatively with CR-339311 (WDFW as primary contractor) B: 165. Environmental compliance documents for this project provided under CR-339311 06/30/2021 06/30/2021
Effective implementation management and timely contract administration C: 119. Manage and administer project 06/30/2021 06/30/2021
Conducted site specific assessments and developed landowner agreements if needed D: 114. Conduct site specific assessments and develop landowner agreements 06/30/2021 06/30/2021
PIT tag recapture data uploaded E: 159. Upload PIT tag data to PTAGIS database 06/30/2021 06/30/2021
Install, operate, maintain, and remove temporary PIT tag antennas F: 157. Construct, install, maintain, and remove temporary PIT tag arrays in preselected locations 06/30/2021 06/30/2021
Keep permanent sites fully operational G: 157. Operate, maintain, and update permanent in-stream PIT tag arrays 06/30/2021 06/30/2021
Number and age of hatchery and wild steelhead based upon PIT tag detections estimated H: 162. Estimate the number and age of hatchery and wild steelhead 06/30/2021 06/30/2021
Completed Annual Report I: 132. Submit Progress Report - Will be submitted under WDFW partner contract (CR-339311) 03/31/2021 03/31/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Environmental compliance documents for this project provided under CR-339311
C 119 Manage and administer project
D 114 Conduct site specific assessments and develop landowner agreements
E 159 Upload PIT tag data to PTAGIS database
F 157 Construct, install, maintain, and remove temporary PIT tag arrays in preselected locations 06/24/2021
G 157 Operate, maintain, and update permanent in-stream PIT tag arrays 06/24/2021
H 162 Estimate the number and age of hatchery and wild steelhead
I 132 Submit Progress Report - Will be submitted under WDFW partner contract (CR-339311)